Project criteria

To be considered seriously, a project needs to meet the basic criteria below. Each of them helps us assess a project’s readiness and feasibility quickly and objectively.

01

Urban planning and technical requirements

The site should have issued urban planning and technical requirements permitting the construction of a solar, i.e. photovoltaic, power plant. This document is the basis for the initial analysis of the project and for assessing how far its planning status has progressed.

02

Grid connection approval

The project should hold a grid connection approval issued by the competent operator. The documentation should clearly state:

  • the approved connection capacity;
  • the substation to which the project will connect;
  • the point of connection;
  • the basic technical conditions of connection.

We are particularly interested in projects where the connection is clearly defined and technically feasible.

03

Project capacity of up to 30 MW

We primarily consider projects with a planned installed capacity of up to 30 MW. Projects may be at different stages of development, but preference is given to those that already hold basic administrative and technical documentation.

04

Access road

The site should have an existing access road, or one that can realistically be built. Access matters for construction, delivery of equipment, maintenance and the later operation of the plant.